CONTROL PANELS

Control Panel Design and Build

Bespoke industrial control panels developed from requirements and electrical design through manufacture, testing, installation and commissioning.

Defined project delivery

From requirement to operational handover

A documented, maintainable control panel built around the machine, process and site standards.

01

Requirements and I/O definition

Define the operating requirements, inputs, outputs and interfaces within the agreed project scope.

02

Electrical schematics and panel layout

Plan the electrical schematics and component layout around the machine, interfaces and site requirements.

03

Panel manufacture and factory testing

Define the panel build and factory test requirements, with records agreed as part of the project scope.

04

Installation, commissioning and handover

Agree site installation, commissioning checks, documentation and handover responsibilities before delivery.

Control Panel Design and Build project delivery
Practical project control

Designed around the operation

Projects begin with the required operational outcome, existing conditions, interfaces and constraints. The scope then defines design responsibilities, equipment, access, programme, safety controls, testing and handover.

Projects can include PLC programming and commissioning, remote I/O, drives, motor control, safety circuits, HMI equipment and industrial communications, subject to the agreed design scope.

  • Requirements and I/O definition
  • Electrical schematics and panel layout
  • Panel manufacture and factory testing
  • Installation, commissioning and handover
REQUEST A PROJECT REVIEW
Controlled delivery

Clear milestones and accountable interfaces

Every project requires an agreed scope, programme, responsibilities, change process and acceptance route. Safety, production continuity and maintainability are considered alongside technical delivery.

Documentation can include agreed drawings, software backups, test records, equipment information, training and handover actions appropriate to the scope.

Ready to define your control panel design and build project?

Start with the outcome, constraints and timescale.